You don't have javascript enabled. Good luck with that.
Pencarian
Pengerjaan LRT Koridor 1 sudah mencapai 37%
.
photo istimewa - Beritajakarta.id

LRT Phase 1 Construction Reaches 37 Percent

Light Rail Transit (LRT) phase 1 infrastructure construction for Kelapa Gading-Velodrome Rawamangun is one of Asian Games support facilities and now its process reaches 37 percent.

Until now, 660 girder boxes and 40 spans have been installed

PT. Jakarta Propertindo (Jakpro) Secretary, Erry Gunari Prakasa said LRT phase 1 route has 5.8 kilometers long.

"Until now, 660 girder boxes and 40 spans have been installed. Budget absorption reaches Rp 1.3 trillion or 20 percent from total budget Rp 6.8 trillion," he said, Wednesday (10/11).

PT. Jakpro Asked to Make Analysis Regarding LRT Route Extension

He explained, LRT Phase 1 will pass through six stations; Depo Pegangsaan Dua Station, station in front of Kelapa Gading Mal, Station on Jl. Boulevard Raya Kelapa Gading, station on Jl. Kayu Putih Raya (Pulomas), station on Jl. Kayu Putih Raya (Equestrian), and station infront of Rawamangun Velodrome Sport Center.

"We plan to install 5.8 kilometers rail by the end of this year," he expressed.

He added, PT. Jakpro has prepared 16 train cars to be shipped in April 2018 for LRT operational.

"We estimate 13 thousand passengers will use this mass transportation service in a day," he closed. 

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye328 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye318 personAldi Geri Lumban Tobing
  4. Rivers with Severe Pollution in Jakarta Decrease

    access_time18-07-2025 remove_red_eye236 personAldi Geri Lumban Tobing
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye233 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik